337p日本大胆色噜噜_欧美成人在线视频亚洲_高清大胆欧美videossexo_免费综合中文高清_国产一级毛片精品国语_日本中文字幕中出在线_麻豆手机在线观看_蜜桃一区二区_欧美Ⅴ亚洲V精品_少妇av春色午夜毛片

喇叭圖標(biāo)
 鄭州凱威防雷是河南省防雷協(xié)會(huì)理事單位,是從事防防雷工程設(shè)計(jì)施工的乙級(jí)資質(zhì)公司,防雷工程涵蓋銀行證券、文物古建筑、城市建筑物、煤礦工業(yè)企業(yè)等行業(yè)的信息系統(tǒng)防雷和建筑物直擊雷防護(hù)。

LIGHTNING RODS

LIGHTNING RODS

EXTERNAL PROTECTION against lightning provides protection to structures against physical damage and injuries for contact voltages and contact with human beings.

The elements of a lightning protection system are the following:

  • Interception system.
  • Down-conductors.
  • Earth Termination System.
  • A correct surge protection installation
  • Other measures minimizing the destructive lightning effects (equipotential bonding, screening, etc.)

A Lightning Protection System (LPS) can be executed through Early Streamer Emission lightning conductors (ESE) or through Rods or Meshed Conductors. These products are manufactured in accordance with the relevant international standards: IEC serie: EN 62.305, EN 50.164.

The functioning of Early Streamer Emission (ESE) lightning conductors is based on the electric characteristics of lightning formation. Lightning initiates with a downward leader, propagating in any direction. Once it approaches objects placed on the ground, any of them can be struck. The objective of an external lightning protection system is to control the lightning striking point thus providing the lightning current a path to the ground without damaging the structure.

The main feature of Early Streamer Emission (ESE) lightning conductors is the emission of a continuous upward leader before any other object within its protected area. The standards define this characteristic using a parameter called advance time (Δt): “Average gain in upward leader triggering compared with a reference point having the same geometry. It shall be obtained by laboratory tests. It is measured in microseconds.”
The advance time determines the protection radius of each lightning conductor. If the triggering occurs earlier, then the distance where the downward leader is intercepted increases, thus avoiding the lightning strike in a wider area. The advance time must be measured in a High Voltage laboratory, following the test procedure described in the standards of lightning protection using ESE Air Terminals.

Lightning protection using rods and meshed conductors is used to share and dissipate the lightning current through a network of down-conductors and earth terminations.

Our products: http://www.badelan.cn/chanpinzhanshi/bileizhen/

EXTERNAL PROTECTION.jpg

上一篇:艾力高ERICO系統(tǒng)3000提前放電避雷針下一篇:O.MEX20 提前放電避雷針
網(wǎng)站首頁 關(guān)于我們 新聞動(dòng)態(tài) 防雷產(chǎn)品 解決方案 工程案例 下載中心 聯(lián)系我們